Quay 7 Superyacht Marina (V&A Waterfront, Cape Town)

| Location | Victoria Basin, V&A Waterfront, Cape Town, South Africa, coordinates 33 54 08.51 S, 18 25 27.28 E |
|---|---|
| Berths | 8 total - 6 stern-in and 2 alongside (beam-on) - for vessels of 40 to 90 m LOA |
| Max draught 10.2 m; tidal range about 1.5 m; stern-to on lazy lines with vessel pontoons | |
| Shore power 600A 3-phase; fresh water at designated berths; VHF channel 14 | |
| Bonded, duty-free fuel available at the Elbow, with no South African tax on departure | |
| On-site refit | a 1,806-tonne Syncrolift ship lift for vessels up to 61 m and 15 m beam |
| Robinson and Sturrock dry docks in the same harbour; Sturrock is 360 m and divisible into two compartments, with a 456 m repair quay | |
| 70% of South Africa's boatbuilding industry is based in Cape Town, with a vetted refit and chandlery network 5-15 km from the berth | |
| Investment | ZAR 230 million (about USD 13.5-13.7 million), announced 17 March 2026 |
| Construction | six 30 m x 6 m floating pontoons (Damen 3006 design, about 48 tonnes each) built by Damen Shipyards Cape Town; keel-laying ceremony held July 2026 |
| Timeline | practical completion targeted for 30 October 2026, official opening November 2026; will be the first Gold Anchor-accredited facility in the region |
| Bookings, berth allocation and billing consolidated through the Smart Waters platform; a single concierge interface for captain and crew | |
| The V&A Waterfront draws 25 million visitors a year with 500+ retail outlets, 80+ restaurants and 13 hotels on site | |
| Won the 2026 Western Cape Economy Innovation Award for infrastructure and connectivity | |
The one honest fact: this marina does not exist yet
The distinction matters because most of what makes a marina worth researching - how the reservation desk actually behaves, whether the dockmaster answers the radio promptly, what a first-time arrival gets wrong - simply has no answer here yet. What does exist is unusually well documented for a facility this new: a named investment figure, a named contractor, a keel-laying ceremony, and a specific completion date that press coverage has tracked in real time since the March 2026 announcement.
The V&A Waterfront's harbour itself is the opposite of new. It has cleared, fuelled and serviced vessels since 1860 and today runs the operation behind what has been named Africa's top cruise port at the World Travel Awards. Quay 7 is a purpose-built superyacht basin grafted onto that existing, working harbour rather than a marina built from nothing, which is the more useful way to read everything that follows.
What is actually being built
The pontoons are the Damen 3006 design, 30 m long and 6 m wide, weighing about 48 tonnes each before outfitting, and the July keel-laying ceremony at Damen's Port of Cape Town factory marked the formal move from planning into physical construction. Each berth is stern-to on lazy lines with vessel pontoons, carries 600A three-phase shore power and fresh water, and the basin is worked on VHF channel 14, the same channel Cape Town's port control already uses for the Traffic Separation Scheme approach. A tidal range of only about 1.5 m is modest by Atlantic standards, which simplifies fixed-pontoon design considerably compared with a harbour carrying several metres of tide.
Eight berths is a deliberately small number against a ZAR 230 million (roughly USD 13.5 million) investment, and that is the point: this is not a volume marina competing on berth count, it is a small, purpose-built basin designed to be the first Gold Anchor-accredited facility in the region and to sit inside a harbour that already does the things a superyacht actually needs done - customs, pilotage, refit - at a professional standard. The Gold Anchor scheme itself is the marina industry's own quality accreditation, run internationally, and being first to hold it in the region is a credential aimed squarely at exactly the audience this entry is written for.

Nobody has berthed a yacht here yet. What exists today is a keel-laying ceremony, a construction schedule, and a harbour with a century and a half of practice at everything except this.
The refit yard is the real reason to come
That combination is unusual for a marina this size: most 8-berth facilities have no serious refit capacity of their own and rely entirely on visiting technicians. Quay 7 sits inside a harbour built for major repair work, with a vetted network of boatbuilding, chandlery and spares businesses within 5 to 15 km, which is the practical argument for choosing Cape Town over a more established but purely berthing-focused marina elsewhere in the Southern Hemisphere.
Bonded, duty-free fuel is available at the Elbow with no South African tax charged on departure, which is a real, quantifiable saving on a long-range refuelling stop rather than a marketing line - though the exact bunkering price is not published and will need to be quoted per vessel.

Booking, timing, and what is genuinely unproven
The March 2026 announcement of the ZAR 230 million project originally floated an October 2026 completion; the more detailed construction update issued after the July keel-laying ceremony - by which point the project was reported at roughly 45% complete - narrowed this to a 30 October practical completion date with the official opening pushed to November. That is the kind of schedule movement worth watching rather than taking as fixed, since a marina's first berthed yacht is usually the true test of whether a construction timeline held.
Nothing about the arrival experience, the berthing fee schedule, or how a busy Grand Prix-style peak week would be handled has been published, because none of it has happened yet. An owner planning a Southern Hemisphere season around Quay 7 in its opening months should treat every operational detail as provisional until the first full season is behind it.
Why Cape Town, and what the city offers beyond the berth
The precinct includes the Zeitz Museum of Contemporary Art Africa and the Cape Town EDITION hotel within walking distance of the berth, and the Waterfront's readers have voted Cape Town Best City in the World five times in The Telegraph's rankings - the kind of shore-side offering that is fully built and tested today, unlike the marina itself.
The strategic case Cape Town is making is a genuinely useful one for an owner to weigh: it sits counter-seasonal to the Mediterranean and Caribbean circuits, on active Atlantic, Indian Ocean and Antarctic routings, which means a Southern Hemisphere winter season here runs opposite the crowded Northern Hemisphere summer everyone else is chasing. Graham Wood, the V&A Waterfront's CEO, put the ambition plainly: "Quay 7 Marina proudly positions Cape Town where it belongs - on the global superyacht circuit."

Cape Town's yachting pedigree runs deeper than one new marina
That matters for how an owner should read this entry: Quay 7 is new and unproven, but the harbour, the yacht club and the ocean-racing culture around it are not. The Royal Cape Yacht Club's own marina and the Cape to Rio's start line sit in the same Table Bay waters as Quay 7, so a yacht arriving for the superyacht basin is arriving into a city that already knows how to handle serious sailing traffic, even if it has never handled it through this specific new berth.
The practical read for a first season at Quay 7: treat the marina's own systems - Smart Waters booking, the concierge desk, the bonded fuel arrangement - as unproven, but treat Cape Town's broader harbour operation, pilotage and refit trade as tested by a sailing culture that has been racing across the South Atlantic from this exact stretch of coast since 1971.
The passage itself is the hard part, not the berth
None of that is unique to the marina or new information for anyone who has sailed the Cape before; it is exactly why a Southern Hemisphere season built around Quay 7 rewards a crew and a routing service with real Southern Ocean experience, not a Mediterranean-only passage plan applied to a different ocean. The V&A Waterfront's own material is silent on weather routing, which is reasonable - that is a passage-planning question, not a marina one - but it belongs in any honest assessment of what choosing Cape Town actually commits a captain to.
Once inside Table Bay, the harbour itself is sheltered and professionally run, which is the whole point of Quay 7 sitting inside an existing working port rather than an exposed anchorage - the difficulty is in the approach, not the basin, and a captain who has already routed the Cape correctly finds a harbour on the other side of it that is, by any operational measure, straightforward.
One small marina inside a much bigger construction story
The six Damen 3006 pontoons being fabricated at Damen Shipyards Cape Town are a small, contained piece of that larger picture: 30 m by 6 m, about 48 tonnes each before outfitting, purpose-built rather than adapted from an existing product line, which is a level of bespoke engineering more typical of a marina several times Quay 7's eight-berth size.
For an owner weighing a first season here, the practical implication is that the Waterfront around Quay 7 will likely still be a partially active construction site even after the marina itself opens in November 2026, simply because the wider Granger Bay works are on a longer timeline than the marina's own eight berths - a detail worth raising with the yacht office directly when planning an early booking rather than assuming the precinct will read as finished on day one.
A terra, accessi e prenotazioni
| Getting there | Cape Town International Airport (CPT) is about 20-25 km from the V&A Waterfront, roughly 25-35 minutes by road depending on traffic. |
|---|---|
| Arriving by sea | VHF channel 14; give Port Control 15 minutes' notice before entering the Traffic Separation Scheme approach to Table Bay. |
| Reserving a berth | Through the Smart Waters booking platform, or via [email protected] / [email protected]; office hours 08:00-17:00 Monday to Friday, with an after-hours duty line. |
| Berths and size | 8 total: 6 stern-in, 2 alongside; 40-90 m LOA; max draught 10.2 m; tidal range about 1.5 m. |
| Power and water | 600A 3-phase shore power; fresh water at designated berths. |
| Fuel | Bonded, duty-free fuel at the Elbow, tax-free on departure; price on application. |
| Refit on site | 1,806-tonne Syncrolift (to 61 m / 15 m beam); Robinson and Sturrock dry docks, the latter 360 m with a 456 m repair quay. |
| What is not published | No berthing tariff has been published, no vessel has berthed here, and the arrival procedure exists only in a captain-facing brochure, not in operational experience. |
| Timeline | Practical completion targeted 30 October 2026; official opening November 2026 (revised from an October 2026 estimate given at the March 2026 announcement). |
Cosa riferiscono armatori ed equipaggi
The harbour is 165 years older than the marina inside it
The Victoria Basin has cleared, fuelled and serviced vessels since 1860, and the same operation now runs what has been named Africa's top cruise port at the World Travel Awards - Quay 7 inherits that operational maturity rather than starting from zero.
V&A Waterfront, World Travel AwardsThe refit yard, not the berths, is what the industry is actually reacting to
Coverage of the project has focused heavily on the Syncrolift and dry dock access and on Cape Town already holding 70% of South Africa's boatbuilding industry, which is the detail that gets a refit-minded owner's attention more than eight new berths would on their own.
SuperyachtNews.com, Engineering NewsNobody has berthed a yacht here, and that needs to be said plainly
Every practical claim in this entry - the reservation process, the power specification, the fuel arrangement - comes from the V&A Waterfront's own captain-facing material and construction press, not from an owner or captain who has actually used the berth, because as of September 2026 none has.
The desk, from V&A Waterfront and construction press coverageThe CEO is framing this as a circuit play, not a local amenity
Graham Wood has described the marina's purpose explicitly as positioning Cape Town on the global superyacht circuit, which is a different ambition from simply adding local berthing capacity.
Graham Wood, CEO, V&A Waterfront
Cosa convince e cosa va valutato
Punti di forza
- Genuinely counter-seasonalA Southern Hemisphere winter season here runs opposite the Mediterranean and Caribbean summer crowd, on active Atlantic, Indian Ocean and Antarctic routes.
- Real refit capability, not just berthsA 1,806-tonne Syncrolift and two dry docks, backed by 70% of South Africa's boatbuilding industry within a short drive.
- Duty-free fuel and a single-platform booking systemBonded fuel at the Elbow with no departure tax, and Smart Waters consolidating booking, allocation and billing into one interface.
- An exceptional shore-side setting, already built and testedTable Mountain above the basin, 25 million Waterfront visitors a year, and a city voted Best in the World five times by Telegraph readers.
Da valutare
- It is not open yetTargeted practical completion is 30 October 2026 with an official opening in November 2026; the timeline has already moved once since the March 2026 announcement.
- Only eight berthsA small basin by design, which means very limited capacity relative to demand once the marina is operating and known.
- No published tariffBerthing rates are not public; every cost has to be quoted per vessel through the yacht office.
- No operational track recordEvery claim about arrival, service and how the marina handles a busy week is unproven until a first full season is behind it.
A chi si rivolge: An owner or captain plotting a genuinely counter-seasonal Southern Hemisphere season, or a refit already planned around Cape Town's boatbuilding cluster